The intention is to be on the water everyday during the upcoming week.
The paint should be finished on sunday, till then a revised A+ rigg will be build ready to be tested.
From then on the three things to do are to build a B rigg and A+ rigg for the father, find something to transport the riggs safely and sail as much as possible.
No comments:
Post a Comment